Engineering calculations, design and fabrication of a total of 550 tonnes of steel structure buildings were carried out, together with tanks, bunkers and thickeners required by the process. The main scope is outlined below:
Project Scope
- 2,200 m² main process equipment building (steel structure)
- 800 m² product storage steel structure building
- 600 m² two-storey office and maintenance steel structure buildings
- 5 pcs 30 m³ settling tanks
- 3 pcs 5-metre thickeners
- Various conditioner tanks and stainless-steel agitator mechanisms
- B=800×35 m / 200 tph conveyor fabrication
- B=1200×6 m under-loading-bunker feed conveyor
- 35 m³ loading bunker and chassis